Bathroom renovations, planned before they start.

Coastal, contemporary, modern or Hamptons. Choose one of our curated packages or customise every detail; either way you follow one clear, well-run process to a bathroom that looks right, works properly and lasts.

Freestanding bath under louvre windows with a timber vanity and brass tapwareKuda renovation

What a renovation is

New everything, inside the layout you have.

A renovation updates the finishes within the existing layout: the shower, bath, vanity and toilet stay roughly where they are, and everything you see and everything behind it is new. For many homeowners it is a major investment, so we run every project with clear planning, experienced supervision and professional standards from day one.

Want the walls or plumbing to move? That is a remodel.

Plan drawing of a bathroom renovated in its existing layout BATHSHOWERVANITYWC EXISTING LAYOUT KEPT ILLUSTRATION · NOT TO SCALE
Renovation: same layout, all new
Open walk-in shower with a grab rail and a wall-hung basin

Accessible bathrooms

Planned around the person using it.

An accessible bathroom starts with who will use it and how. We design the layout around them: open, frameless walk-in showers, room to move, and every fitting placed where it is needed.

Tell us about the person and the room at your phone consultation, and we’ll plan from there.

More than one room?

We take on multiple bathrooms, and extras like laundries and kitchens, alongside a bathroom renovation, and allow slightly longer on the programme for them. Laundries usually fall between $20,000 and $40,000.

FAQ

Questions people ask

Or ask us: 07 5491 4458

How much time do I need for planning?

Plan on about 12 weeks before your start date. That covers the key decisions, detailed design documents and your selections. Once everything is locked and ordered, we need about 6 weeks to coordinate materials before work starts on site.

Can I use my bathroom during the renovation?

In most cases it is completely out of use. If it is your only bathroom you will need other arrangements for the duration, and we set out the timeline upfront so you can plan.

What should I consider when choosing fixtures?

Balance design, durability and budget: moisture resistance, how easy it is to clean, and how it suits the overall design. Choosing early keeps the project on track.

How do you make sure the waterproofing is right?

We follow strict Australian Standards and use proven systems and materials, and each stage is managed and checked. The waterproof integrity of the work is guaranteed for 7 years.

Do I need council approval?

Not usually, unless the structure or outside of the building changes. Moving plumbing, or work in apartments and high-rises, may need body corporate approval or other compliance. We assess this early.

Start with a free phone consultation.

Tell us about the room, who uses it and your budget. We’ll explain how it would run, and book a time to see it.

Call 07 5491 4458

Free consultation

Tell us about the room.

We use your details only to reply to you. Privacy.

Thank you.

One of the team will be in touch to arrange your free consultation. If it’s urgent, call 07 5491 4458.