About Kuda Bathrooms
Plan with purpose.
We are a family owned and operated business, built around planning, structure and clear communication. Not just beautiful bathrooms: renovations that run smoothly, finish on time and do what you expected.
Kuda bathroomOur mission
Certainty in the timeline, the cost and the result.
A successful renovation comes down to good planning, clear decisions and a well-managed build, not luck. So we follow one structured process from design to construction to handover, and every renovation is built by our own in-house tradespeople to one consistent standard.
- QBCC licensed (15317715; Gold Coast 15475759) and fully insured
- Master Builders Association member
- A dedicated project manager on every job
- A fixed-price contract with a clearly defined scope
What happens when
Eight steps, first call to handover.
You always know what’s happening, when, and which decisions are yours.
A phone consultation
Free. We talk through what you want, who uses the room and your budget, and how a renovation with us runs.
Design consultation in your home
We visit, measure and look at the space with you. This is where your bathroom starts to take shape.
Design and no-obligation quote
A full plan with a breakdown of costs, scaled floor plans and 3D visuals of the proposed room, so you can be sure before you commit.
Planning and contract
With your approval we finalise the details and sign the fixed-price contract. Your project manager visits for final measurements and selections.
Fixtures and fittings
You get a shopping list and a one-on-one appointment at a Reece showroom. We check every choice against the plan and handle the ordering.
Your project portal
Access to Buildertrend, the cloud portal where you follow progress, updates and documents in one place.
The renovation
Our own team protects your home and builds the room, with the site cleaned and presented properly from start to finish.
Handover
We inspect every detail with you, and you receive a practical completion report. Then the bathroom is yours.
Work back from your date
When do you want to be using it?
Pick the room, say whether walls or plumbing move, and choose when you’d like it finished. This uses Kuda’s published phase lengths and price ranges; your own programme is set at your quote.
- —Call us by this date to start planning
- —Construction starts (6 weeks of planning, selections and approvals before)
- —Handover (6–8 weeks of construction)
- $30,000–$50,000Most ensuites
A guide only, from the figures on Kuda’s website. Christmas, public holidays and complex sites can move the dates.
Our guarantee
Seven years. In writing.
We’re fully insured, qualified medium-rise registered builders, and we’ll still be here if you ever have a problem. The average QBCC home warranty period is 6.25 years; we extend ours to a full seven.
- Workmanship guaranteed for 7 years
- Waterproofing, adhesives and grouts guaranteed for 7 years
- The waterproof integrity of the work guaranteed for 7 years
- Shower screens, products, fittings and fixtures we supply: the manufacturer’s warranty period
- All warranties subject to the QBCC’s normal terms and conditions
Will Kuda design my bathroom?
Yes. As part of your quotation you receive a fully customised design, including scaled floor plans and 3D visuals, so the layout and overall direction are clear before anything moves forward.
How long will it take to build my bathroom?
The project runs in two phases. Planning, selections and approvals take about 6 weeks; construction takes 6 to 8 weeks. For complex projects with structural changes or a new layout, allow about 8 weeks of preparation, then 8 to 10 weeks of construction.
How much does a bathroom renovation cost?
Most projects fall within these ranges: ensuites $30,000 to $50,000, main bathrooms $35,000 to $50,000 or more, and laundries $20,000 to $40,000. The final cost depends on layout, structural changes, selections and scope. Once your layout and selections are confirmed you receive a detailed fixed-price proposal.
Do you supply fixtures and fittings?
Yes, from top-tier suppliers of fittings and tiles. If you would rather source your own, we can quote for installation alone.
Do I need council approval?
Most standard renovations don’t, if the structure isn’t changing. Apartments, high-rise buildings or big layout changes may need body corporate approval or compliance checks, which we confirm early.
What should I allow for unexpected costs?
It is common to keep a contingency for things nobody can see until the old bathroom comes out, such as hidden water damage or structural problems. Good planning reduces the risk.
What are the most common renovation mistakes?
Poor planning, decisions made too late, and putting looks ahead of how the room works. They cause delays and overruns, which is why our process locks decisions before construction.
Start with a free phone consultation.
Tell us about the room, who uses it and your budget. We’ll explain how it would run, and book a time to see it.