Bathroom renovations · Gold Coast
Bathroom renovations, Gold Coast.
Ready to say goodbye to an outdated bathroom? Our Gold Coast team works from Burleigh Heads, with the same in-house trades and structured process as every Kuda job.
Earthy modern | MaudslandHow we work here
Gold Coast renovations, made easy.
In-house tradesmen
Our core tradespeople are employees, not subcontractors: no unnecessary delays, quality workmanship every time, and people who respect you and your home.
Stress-free collaboration
Clear communication from the first consultation to the final walk-through, with you involved at every step.
Design and build
An on-site meeting with our head builder to design the room, choose materials, fittings and fixtures, and settle the layout, with 3D CAD drawings of the new bathroom.
Gold Coast office
Free consultation.
Monday to Friday, 8am to 4pm
Our guarantee
Seven years. In writing.
We’re fully insured, qualified medium-rise registered builders, and we’ll still be here if you ever have a problem. The average QBCC home warranty period is 6.25 years; we extend ours to a full seven.
- Workmanship guaranteed for 7 years
- Waterproofing, adhesives and grouts guaranteed for 7 years
- The waterproof integrity of the work guaranteed for 7 years
- Shower screens, products, fittings and fixtures we supply: the manufacturer’s warranty period
- All warranties subject to the QBCC’s normal terms and conditions
What is the overall process?
Clear stages: consultation, onboarding, design and selections, planning and construction. Each stage has defined outcomes, and we move on only once the key decisions are made and confirmed.
What happens at the quote stage?
We work out the right layout for your budget, lifestyle and who will use the room, and you receive a detailed fixed-price quote for the build and materials, with allowances for fittings, tiles and cabinetry so you see the full cost upfront.
What does “locking in” decisions mean?
Before construction, the layout, scope and selections are finalised and approved. The lock stops changes during the build, which are the main cause of delays and cost increases.
When does construction begin?
Only once the design is locked, materials are ordered and the site is ready. That is what makes the build smooth and predictable.